Solutions for Prevention Solution

Sm@rtFAB mesh in Shotcrete for Earth Retaining Structures

TATA Steel – All Regions

Shotcrete is a method of applying concrete projected at high velocity primarily on to a vertical or overhead surface to strengthen temporary and permanent excavations, earth retaining structures, tunnels, canal linings etc.

Concrete-filled Composite Steel Plate Shear Wall

Nucor Construction Solutions – All Regions

The Concrete-filled Composite Steel Plate Shear Wall (CF-CPSW) comprises sandwiched panel of steel plates that are filled with concrete.

Steel Pipe Sheet Piles and Steel Pipe Piles

Japan Iron and Steel Federation – All Regions

Work to control tsunami waves in a major earthquake and storm surge in a typhoon can be executed in a short period of time.

Heavy Steel Factory Building with Crane and Equipment Platform

HBIS Group – All Regions

Steel factory beam-to-column connections are fully rigid connection along the span direction, use cross brace system along the column spacing direction Steel has good ductility and higher elongation than concrete structures.

Double Steel Sheet Pile Walls

Japan Iron and Steel Federation – All Regions

Method for reinforcing river embankment by restraining Double (double row) Steel Sheet Pile Walls as embankment body by tie rod.

constructsteel is not liable for the solutions and products displayed. The companies/solutions providers are solely responsible for the information provided.

All images on this page are used with permission or believed to be in the public domain. If you believe any image infringes your copyright, please contact us at constructsteel@worldsteel.org for prompt resolution.

To upload a product, click here

To view FAQ's, click here